News

 

LF823 Revolution stockpiling ash/ aggregates

13 February 2018 @ 16:09


LF823 Revolution stockpiling ash/ aggregates in Belgium

TCL1031 Tracked Conveyor stockpiling aggregate after Metso LT125E Primary Jaw Crusher

27 July 2017 @ 12:15


Padraig McDermott (Telestack Sales Manager) has just returned with customers interested in the Telestack TCL Range from Hanson's Quarry in the UK.

OFFICIAL OPENING OF OUR NEW PAINT FACILITY

24 July 2017 @ 14:15


Telestack have opened their multi-million pound bespoke paint facility at their 95,500sq ft. manufacturing plant based in Omagh.

LF520 REVOLUTION ON DISPLAY AT STEINEXPO 2017

19 July 2017 @ 15:37


Global leader in the design and manufacture of mobile material handling equipment Telestack, look forward with great anticipation to exhibiting at the forthcoming SteinExpo which takes place from 30 August to 2 September in Homberg/ Neider-Ofleiden, Germany.

Local Press Interview with Malachy

19 June 2017 @ 14:57


Local Press interview with Malachy Gribben, Telestack Commercial Director.

TS842 Bargeloading Bauxite

24 May 2017 @ 16:15


2,000t barge is loaded by a TS842 radial stacker positioned at the end of a floating pontoon. Product bauxite is then loaded onto a shuttle barge using a HF520 and transported and transferred to a bulk vessel using a mounted TC424.

Anticipation Grows As CONEXPO-CON/AGG 2017 Draws Closer

23 February 2017 @ 10:30


Anticipation is growing as the CONEXPO-CON/AGG 2017 exhibition – the largest trade show in the construction industry - draws closer. Telestack will be exhibiting at booth #C30332 in the Central Hall C3 - C5.

Telestack commence work on multi-million pound paint facility

10 January 2017 @ 13:30


2017 is getting off to an exciting start with the build well underway on the installation of a multi-million pound bespoke paint facility at their 80,000sq ft. manufacturing plant based in Omagh. The additional 15,500sq ft. purpose built facility will incorporate a bespoke designed pre-treatment facility, preparation area and 3 independent paint booths ensuring the Telestack paint facility will be one of the largest and most technically advanced painting facilities in the country.